Projects
Recent Projects
Some of the projects our team has completed along with ongoing projects being upheld by the company:
VBCH Nursing College/Hostel/Imaging center
The VBCH Nursing College is a place of learning for the future healthcare professionals.The architecture of this college is not only functional but also creates an atmosphere conductive to learning and healing.
Start Date: 21/10/2015
End Date: In progress
Estimation: 90cr
Construction of kala Kendra
The Kala Kendra at Silvassa is an industrial, modern-looking building complex with a smooth blend of windows that add to its fresh looks. It is also modern in its functionality, as it features an enclosed bridge that connects two buildings together and other similar structures.
Start Date: 15/10/2014
End Date: 18/01/2022
Estimation: 30cr
Circuit House
A well-thought out building complex with extensive gardens overlooking the nearby river that radiates a peaceful atmosphere. The establishment has been standing strong with R.C.C frame structure implemented into it. The furnishing work consists of structural glazing with spider fitting, aluminum composite paneling & louvers, etc.
Start Date: 16/12/2011
End Date: 14/06/2016
Estimation: 20cr
Underground Parking and Exhibition area
A massive construction of an underground parking, which includes an exhibition area and a pavilion for the Government College in the same area. It houses a R.C.C water tank with the capacity of 1.2 ML. The site also houses other essential systems such as electrical substation, drainage & water-proofing, DG set, and more.
Start Date: 23/06/2016
End Date: 18/03/2020
Estimation: 19cr
District Secretary Office (Interior Work)
The District Secretary Office is a modernized building with state-of-the-art interior design, featuring a spacious meeting room with sleek furnishings and a well-lit office space. The team also installed essential elements such as CCTV, electrical appliances, and more to ensure a fully functional and secure environment.
Start Date: 28/02/2019
End Date: In progress
Estimation: 19cr
Government College
Located at a prime location, the government college is popular among its students for its progressive infrastructure and education. Our team was involved in constructing a R.C.C structure ground plus 3 floors along with a variety of other services such as HVAC, internal electrical installation, sanitary installation, water supply, and more.
Start Date: 12/03/2013
End Date: 15/09/2015
Estimation: 19cr